Have a list of projects we would like to begin/work on this summer. A few include removing the pine trees that fell during a storm this spring (unplanned project), improving the back field, and have a second pad built for a car port or some type of storage building. In a way having the pine trees fall over was a positive. We are looking at having a second pad built in that area. The pine trees would have had to be removed anyway. The area marked by the pink ribbon is where we are considering having a pad build.

With the improvements we made last year, we need (and want) a few things to assist with maintaining Crabby Acres. Having these items also means additional storage and a place to keep these items.